qiao@hvtest.cc15871365102
  • UHV-740 Capacitive Voltage Transformer Field Calibration Instrument

    Provides accurate ratio and phase error measurement for voltage transformers in electrical power testing applications.

    Product Details of UHV-740 Capacitive Voltage Transformer Field Calibration Instrument

    Product Introduction

    We are a professional manufacturer and supplier of high-voltage power testing equipment in China.UHV-740 Capacitive Voltage Transformer Field Calibration Instrument GIS Field Calibrator simplifies on-site error calibration for electromagnetic (PT) and capacitive voltage transformers (CVT), overcoming traditional challenges of complex wiring, bulky equipment, and high-voltage requirements. This all-in-one solution performs accurate low-voltage measurements across multiple ratios (6kV-220kV/100V), integrating innovative technologies like variable-frequency power supply, common platform design, and simulated voltage loads.

    HTY_2338HTY_2345HTY_2342


    Key Features & Benefits

    1、All-in-One Testing Solution

    Eliminates need for boost sources/load boxes by using voltage transformer load curve extrapolation to measure PT/CVT errors (ratio/phase) at 20%-120% loads, fully compliant with national standards.

    Comprehensive Parameter Measurement

    2、Single device tests:

    PT/CVT ratio & phase errors

    CVT partial voltage ratio/capacitance

    Intermediate PT ratio/voltage

    DC resistance

    Polarity/ratio/wiring checks

    3、Efficiency & Safety

    One-click complete testing reduces errors/risks

    <4kV operation with multi-layer protection

    16GB storage (millions of datasets)

    Fast frequency-conversion tech with anti-interference

    4、User-Centric Design

    WINCE OS with dual-mode operation (touchscreen/mouse)

    Intuitive wiring diagrams for foolproof connections

    Dual USB ports for instant data export


    Ürün parametreleri

    teknik parametreler

    Environmental conditionSıcaklık(5~40)℃
    Bağıl nem<80%(25℃)
    Sea level<4500m
    Güç frekansı50±0.5Hz
    Type of the voltage transformer to be measuredGIS Electromagnetic (PT), Capacitive Voltage Transformer (CVT)
    Primary voltage6-500kV/√3(Non-standard primary voltage is also acceptable)
    Secondary voltage100V,100V/√3,110V,110V/√3,100/3V
    Accuracy of error measurement0.05%
    Partial pressure ratio measurement accuracy0.5%
    Measuring accuracy of partial voltage capacitance2%
    DC resistance measurement accuracy0-0.1Ω3%
    0.1-501%
    Internal standard voltage transformer sectionRatio range6kV/100V、6kV/√3 /100V/√3
    10kV/100V、10kV/√3 /100V/√3
    35kV/100V、35kV/√3 /100V/√3
    110kV/100V、110kV/√3 /100V/√3
    220kV/100V、220kV/√3 /100V/√3
    330kV/100V、500kV/√3 /100V/√3
    Accuracy class0.02%
    Verification part of the calibratorVoltaj aralığı0-100V (dial indicator error 0.5%)
    Ratio error0.001%-3% (100V)
    Angular difference0.00′-50′(100V)
    Hata△X=±(2%×X+2%×Y±2 words)
    △Y=±(2%×X+2%×Y±2 words)
    Admittance0.1ms-99.9ms
    Hata△X=±(2%×X+2%×Y±2 words)
    △Y=±(2%×X+2%×Y±2 words)
    Overall dimensions (mm)496*394*185
    Weight (kg)14.0


    Application Scenarios

    Substation on-site testing — Before commissioning of newly built or expanded substations, perform ratio, phase error, polarity, and wiring verification on PT/CVT.

    Substation operation and maintenance — Regular preventive testing, equipment condition inspection, and fault diagnosis to determine whether the PT/CVT has any abnormal parameters.

    GIS equipment testing — On-site verification and parameter testing of electromagnetic PTs and CVTs within GIS.

    Power metering / calibration — Checks the ratio and phase error of metering-grade PTs/CVTs, suitable for metering inspection, calibration, and related work.

    Power equipment manufacturing and engineering commissioning — Factory testing by PT/CVT/GIS manufacturers; on-site acceptance testing by EPC contractors, electrical installation companies, and third-party testing organizations.


    Frequently Asked Questions

    Q:What types of voltage transformers can the UHV-740 test? 

    A:The UHV-740 is designed for testing electromagnetic voltage transformers (PTs) and capacitive voltage transformers (CVTs), including voltage transformers installed in GIS systems. 

    Q:Can the UHV-740 test both PT and CVT? 

    A:Yes. The UHV-740 supports comprehensive testing of both PTs and CVTs, including ratio error, phase error and other relevant parameters. 

    Q:Can the UHV-740 be used for GIS applications? 

    A:Yes. The UHV-740 is suitable for on-site testing of electromagnetic PTs and CVTs in GIS equipment.

    Q:What are the main advantages of the UHV-740?
    A:Its main advantages
    include integrated PT/CVT testing functions, portable field operation, reduced dependence on conventional test equipment, multiple measurement functions and simplified on-site testing.








    Bunları da beğenebilirsin

    • Herhangi Bir Sorunuz Var mı?

      HER ZAMAN BİZİMLE İLETİŞİME GEÇMEKTEN ÇEKİNMEYİN
      Bize Ulaşın
    • Bizi ziyaret et

      Bina 6, Optik Vadisi Optik-Mekanik Endüstri Parkı, 84 Gaoxin 5 Yolu,
      East Lake Yeni Teknoloji Geliştirme Bölgesi, Wuhan Şehri, Hubei Eyaleti, Çin

    • Bize e-posta gönderin

      qiao@hvtest.cc

    • Bizi Arayın

      +86-15871365102